A few floating LNG vessels have been built by different companies.  f you think about using modules for a shore-based plant, a floating LNG vessel is one big module for the entire plant. If you were in charge of building the second vessel and putting the entire project together, would you look for a resource that an exact duplicate would work on, or would you pick the best project and adjust the design? Explain your answer. You can make your own guess as to the savings for vessel 2 if needed, I would guess a 30% savings for a different design and a 50% savings for the same design.  

0
Additional Comments:
Rating max score to > pts

Rubric

 
 
 
 
 
 
 
     
Can't change a rubric once you've started using it.  
Find a Rubric
Find Rubric
Title
You've already rated students with this rubric. Any major changes could affect their assessment results.
Title
Criteria Ratings Pts
Edit criterion description Delete criterion row
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit rating Delete rating
5 to >0 pts
Full Marks
blank
Edit rating Delete rating
0 to >0 pts
No Marks
blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
Total Points: 5 out of 5