Quiz 11

  • Due Dec 3, 2020 at 9pm
  • Points 10
  • Questions 5
  • Available until Dec 3, 2020 at 9pm
  • Time Limit 40 Minutes

Instructions

Use the following information for questions 1 through 3:

A manufacturing company has conducted a time study for 10 cycles of a job. The job has five elements, and the total elemental times (minutes) for each element and performance rating factors are as follows:

Time Studies.png