Quiz 11
- Due Dec 3, 2020 at 9pm
- Points 10
- Questions 5
- Available until Dec 3, 2020 at 9pm
- Time Limit 40 Minutes
Instructions
Use the following information for questions 1 through 3:
A manufacturing company has conducted a time study for 10 cycles of a job. The job has five elements, and the total elemental times (minutes) for each element and performance rating factors are as follows:
Only registered, enrolled users can take graded quizzes